Thursday, May 21, 2015

MASTER BATH REMODEL

This was a total update. The glass blocks were removed, and a Pella casement window was installed. New windows were also installed in toilet area and master bedroom. The tile shower was leaking through the bench and floor pan, which required replacing plywood before new cement board substrate was installed. Kerdi waterproof system was used in shower area and drain was moved. Moen multi function shower unit was used to accommodate handheld shower. Custom  brackets were used in shower shelf and bench. Bench is rated at 400 Lbs. A new Pearl Maxx whirlpool tub was also installed. Matching granite was used in shower, lavatory top, and threshold at entry door. Custom beveled mirrors were also made with matching wood moldings.













































Labels: , , , , , ,

Sunday, October 12, 2014

BEDROOM REMODEL




On This job the homeowners were not happy with the height of the ceiling in there Master Bedroom. It was about 6" 7". We removed the ceiling joists, depth was added to rafters with 2"x6" lumber being attached with case hardened structural screws. Gussets were added at ridge. A small surport wall was also built. Insulation baffles were installed along with new wiring, lighting fixtures, and cable for TV was rerouted. Then R-30 insulation was installed in ceiling, and walls had insulation upgrades. Drywall was installed, finished, primed and painted. A new ceiling fan was installed. The new TV was wall mounted. A custom oak and walnut bookcase was made. The closet was also reconfigured using matching oak and walnut. Carpet was installed at a later date. Hopefully, a picture will be added at a later date. Owners have told us that HVAC is now working much better now due to improved insulation in walls and ceiling. 



























Labels: , , , , ,

Tuesday, October 20, 2009

Bathroom Re-Model

On this job the whole bathroom was gutted. Walls and a doorway in the adjoining room were moved to allow for new layout. A pocket door was used to save space. New wiring, lighting, exhaust fan, and insulation were installed. Custom tile, and enclosure in shower. Granite in shower, on vanity and knee wall tie bathroom togeather. Bead board was incorparated on walls. Bedroom floors were also re-finished.















Labels: , , , , , , ,

Wednesday, July 23, 2008

2nd Floor Addition