Sunday, September 15, 2013

BASEMENT BATHROOM



On This job, a leaky basement bathroom was gutted, waterproofed from inside and out. A new layout, updated fixtures, a heated tile floor. custom shower with plate glass door.












 The french drain around the rest of the basement was tied into in bathroom area. All new PVC drain pipes above and below ground. Proper insulation installed along with proper ventilation to the outside. Avapor barrier and re-enforced concrete were poured. A 220 volt electric heat mat was installed under tile.
















Outside proper drainage was installed, gutters and downspouts were re-routed to get water far away from house.





 Finished bathroom.