Thursday, March 22, 2012

MASTER BATHROOM RE-MODEL

 On this job we totally gutted this 70's bathroom. We extended the wall back into the bedroom 18" to make room for a larger vanity with double bowl vanity. The shower was also enlarged and a new mud-set was installed as the old shower pan was leaking. All new tile, walls properly insulated, new rough-in plumbing, wiring, and proper ventilation to mention a few things. All in all, new from top to bottom.










Labels: , , , , , , ,

Thursday, March 15, 2012

WHYDHAM HILLS RAISED PANELS

 An improperly repaired gutter lead to major damage over the years on the back of this house. Attemps to make repairs to the raised panels and gutter were made over the years, but were never done right. All the old rotted frame work was removed, and a new exterior plywood base was installed. Some of the raised panels were salvaged and re-used. All new frame work was installed, primed and painted. The Copper gutters were also repaired properly.