Thursday, March 22, 2012

MASTER BATHROOM RE-MODEL

 On this job we totally gutted this 70's bathroom. We extended the wall back into the bedroom 18" to make room for a larger vanity with double bowl vanity. The shower was also enlarged and a new mud-set was installed as the old shower pan was leaking. All new tile, walls properly insulated, new rough-in plumbing, wiring, and proper ventilation to mention a few things. All in all, new from top to bottom.










Labels: , , , , , , ,

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home