Tuesday, October 20, 2009

Bathroom Re-Model

On this job the whole bathroom was gutted. Walls and a doorway in the adjoining room were moved to allow for new layout. A pocket door was used to save space. New wiring, lighting, exhaust fan, and insulation were installed. Custom tile, and enclosure in shower. Granite in shower, on vanity and knee wall tie bathroom togeather. Bead board was incorparated on walls. Bedroom floors were also re-finished.















Labels: , , , , , , ,