Bathroom/Laundry
Labels: Eric Marks Contractor York PA
Thursday, April 2, 2009
Bathroom Re-Model
On this job we expanded a 1st floor powder room into a full bathroom. The rough inplumbing needed to be put under concrete floor. Floor was raised to insulate and house plumbing and some electric. An electric heat mat was installed under tile. A pocket door was installed to save space. Old toilet area was made into a coat closet. Custom glass shower door top off job.
Labels: bathroom remodel york pa, Eric Marks, Eric Marks Contractor, Eric Marks Contractor York PA, heated tile floor, Master Bath, Remodeling Contractor, Tile, York Pa.
Laundry/Pantry
Labels: Eric Marks Contractor York PA
Kitchen Prep Area
In this job we moved the laundry area from in the kitchen to the oppisite wall in the garage. Inside we built a kitchen prep area. new lighting, butcher block top installed, bar sink, stainless steel backsplash, and under counter fridge.
Labels: Eric Marks Contractor York PA