AZEK DECK
On this job we had to remove the old concrete pad to get the proper elevation.
Holes were dug for concrete piers. A beam was fabricated and placed on galvinized stell brackets attached to concrete piers. Deck joists were framed in place. Azek decking and railing were installed.