Tuesday, June 21, 2016

PELLA WINDOW INSTALL

 On this job, the old Anderson windows were showing there age. The opening cranks were not working to well, the vinyl was getting brittle, and there was water damage on more then a few of the windows. The old windows were removed, and openings were re-framed. Windows were installed, properly insulated, plastered, fininshed, painted and trimed out on inside. The outside were finished with factory powder coated trim pieces for a custom fit. All in all another fine home improvement.




























Labels: , , , , , , ,

CUSTOM CLOSET

On this job, the closet only had wire shelving. We came up with a design, based on customers needs. Cabinet grade plywood and clear pine were used to match existing trim. Wood was cut and finished at our shop. Installation went smoothly, and customer quickly filled up all the spaces.

















Labels: , , , , , ,

Wednesday, April 20, 2016

AZEK DECK

On this job we had to remove the old concrete pad to get the proper elevation.
Holes were dug for concrete piers. A beam was fabricated and placed on galvinized stell brackets attached to concrete piers. Deck joists were framed in place. Azek decking and railing were installed.






















Labels: , , , , ,

Sunday, December 6, 2015

ES3 LUNCHROOM

This was a nice little job at ES3, a local distribution warehouse. The old cabinets in the lunchroom were showing there age. Also the CVT tiles were coming loose on the floor due to leaky plumbing. New cabinets, formica backsplash, counters, and new sink with faucet were installed. The floor was also preped and new tiles installed. We also made a new microwave cabinet back at the shop. 







Labels: , , , , ,