Wednesday, June 9, 2010

BATHROOM RE-MODEL


On this job, we again stripped the bathroom down to the bare bones and started from scratch. Bathroom was re-wired, plumbed, properly insulated and ventilated. A mud set was used in the shower area for tile floor. The tile was used around the walls in the bathroom for added effect. New wooden doors were also installed. Custom plate glass  sliding doors were installed to complete the job.























































Labels: , , , , , ,

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home