Monday, April 30, 2012

PATIO ROOF

On this job the old Pergola was taken down due to the fact is was built with the wrong materials and was rotting out. Concrete needed to be cut out and new peir footers poured where posts for roof would be located. New roof and ceiling were framed up. Rubber roof was tied into old shingle roof. The whole project was done with materials that are maintance free.









Labels: , ,

0 Comments:

Post a Comment

Subscribe to Post Comments [Atom]

<< Home